Enquiries: 01305 251150

Updated 25 March 2024

Wednesday 20 March

There will be engineering works happening on the hospital site on Saturday (23 March) as part of the Ridgeway Ward refurbishment that will cause some disruption outside North Wing, Entrance 1 and South Wing, Entrance 1.

Pedestrians will still be able to access North Wing, Entrance 1 and South Wing, Entrance 1, but there will be no vehicle access to South Wing, Entrance 1.  Ambulances and patient transport services will be able to drop off outside North Wing, Entrance 1.

No other vehicles will be able to enter the area, but the drop-off area by the Portesham Unit (in front of North Wing, Entrance 2) will remain open as usual.The area outside both entrances will be closed off to public and staff vehicles from 6pm on Friday (22 March) in preparation.

Marshals will be on site on the day to assist. We apologise for any inconvenience caused.